Success Story

From Surge Struggles to Steady Performance

How one U.S. refinery transformed a failing compressor into a reliable, high-performing asset with CCC Inside® for Yokogawa CENTUM VP

Persistent surges, manual workarounds, unreliable startup. These were just a few of the challenges a U.S. refinery faced with a critical refrigeration compressor in its Alkylation Unit. Downtime, energy waste, and operator fatigue were mounting until they partnered with CCC.

This story details how CCC delivered a smart retrofit solution that integrated directly into the plant’s Yokogawa platform. From improved antisurge protection and automated control to real-time performance diagnostics, the results were immediate and impressive.

Discover how this facility now saves over $140,000 annually in energy costs, while operating with fewer disruptions, more visibility, and greater long-term confidence.